Research news and articles

Filter on subject

SELECT INTERVAL
RSS
2018
20 SEP

Long wind turbine blades require new composite materials

In the future wind turbine blades are going to be up to 107 meters long. Wind turbine blades of this size require new composite materials. DTU Wind Energy is up for the...

Wind energy Energy
18 SEP

EROSION results presented in Bergen

Results from the EROSION project were presented at Science meets Industry in Bergen last week.

Wind energy Energy
13 SEP

DTU Wind Energy in close collaboration with National Taiwan University

Copenhagen Infrastructure Partners (CIP), National Taiwan University (NTU) and DTU Wind Energy have joined forces in working on a local offshore wind education in Taiwan...

Wind energy Energy
06 SEP

Industrial processes to be electrified

Ambitious research project wants to find electric solutions to replace heat treatment in for instance the food industry and in laundries. The next step is a national strategy...

Construction and mechanics Electricity supply Energy
03 SEP

Production runs for the mesoscale wind atlas have been launched

A milestone within the NEWA project has been reached: The mesoscale production runs which will form the backbone of the New European Wind Atlas have been launched on the...

Wind energy Energy
30 AUG

Outdoor path lighting will benefit the climate

Colourful lighting along the paths around the Svalin co-housing complex shows residents when the electricity in their sockets is climate-friendly to use.

Electrotechnology Energy
28 AUG

A great interest for large wind turbines in Østerild

The National Test Centre for Large Wind Turbines in Østerild and the Test Centre in Høvsøre are to be expanded. It is expected that the future wind turbines in Østerild...

Wind energy Energy
24 AUG

Two small radars installed at DTU Risø Campus

The WS100 is a small Doppler radar measuring the size and velocity of hydrometeors. 

Wind energy Energy
16 AUG

New test stands at Østerild and Høvsøre are put out to tender

The test facilities in Østerild and Høvsøre are each to be expanded with an additional two test stands. The in total four new test stands are now put out to tender.

Wind energy Energy
31 JUL

DTU Wind Energy are favourably disposed towards the energy agreement

Deputy Head of Department of Wind Energy, Peter Hjuler Jensen, notes that the Danish Parliament is reunified at the energy area as all parties have signed the energy...

Wind energy